Member LoginMember Login - User registration - Setup as front page - Add to favorites - Sitemap First unit of Maerdang Hydropower Station connected to grid !

First unit of Maerdang Hydropower Station connected to grid

Time:2024-04-30 02:43:39 source:World Warp news portal
The<strong></strong> construction site of the Maerdang Hydropower Station, China's highest-altitude facility of its kind on the upper reaches of the Yellow River in Maqen County, Guoluo Tibetan Autonomous Prefecture, Qinghai Province, March 31, 2024. (Photo/China News Service)

The construction site of the Maerdang Hydropower Station, China's highest-altitude facility of its kind on the upper reaches of the Yellow River in Maqen County, Guoluo Tibetan Autonomous Prefecture, Qinghai Province, March 31, 2024. (Photo/China News Service)

Related information
  • Recently reinstated receiver Quintez Cephus signs a one
  • Sizzling Scottie Scheffler holds five
  • The culinary game at MLB ballparks has exploded in the past 20 years. Eating healthy is a challenge
  • Cruz Beckham's VERY sweet tribute to mum Victoria at her star
  • Chinese military ready to boost ties with Indonesian counterpart: defense spokesperson
  • Rafael Nadal poised for Laver Cup swansong in Berlin in September
  • Tesla cuts the price of its "Full Self Driving" system by a third
  • Yoko Ono to receive Edward MacDowell Medal for lifetime achievement
Recommended content
  • Classic Peking Opera films set for screening in Beijing
  • Doja Cat closes Coachella in a hair
  • Express files for Chapter 11 bankruptcy protection, announces store closures, possible sale
  • Michael Jordan celebrates NASCAR Talladega win with driver Tyler Reddick's son
  • 2 policemen killed, 1 injured in 'terror' attack in SE Iran
  • Revealed: Harry Styles superfans face 80